5th May 2016- Maize Drilling Commences

20160503_174124_resized20160505_084907_resized20160505_084923_resized20160505_123325_resizedMaize Soil Temo

Maize drilling has finally started almost 18 days behind our original planned start date with both the F8 and TPV now in operation. As with all new pieces of equipment there is always the first initial phase where we have to tweak the drill in places to make sure everything is right but thankfully we have 3 guys from Vaderstad to iron out any issues. So far so good!! Definitely a good purchase and one which can be used for so much more than just maize drilling………..watch this space.

Post a comment